Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects, Unpublished PhD Thesis, , The George Washington University.

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects, Unpublished PhD Thesis, , The George Washington University.

Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships, Unpublished PhD Thesis, , The George Washington University.

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings, Unpublished PhD Thesis, , George Washington University.

Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships, Unpublished PhD Thesis, , The George Washington University.

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction, Unpublished PhD Thesis, , George Washington University.

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches, Unpublished PhD Thesis, , The George Washington University.

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects, Unpublished PhD Thesis, , George Washington University.

Farmer, C M (2018) Constructing program management offices for major defense acquisition programs: Factors to consider, Unpublished PhD Thesis, , The George Washington University.

Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry, Unpublished PhD Thesis, , The George Washington University.

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects, Unpublished PhD Thesis, , George Washington University.

Innocent, M J F, Jr. (2018) Predicting military construction project time outcomes using data analytics, Unpublished PhD Thesis, , The George Washington University.

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola, Unpublished PhD Thesis, , George Washington University.

Kim, E (2000) A study on the effective implementation of earned value management methodology, Unpublished PhD Thesis, , The George Washington University.

Krone, S J (1991) Decreasing the impact of changes, Unpublished PhD Thesis, , George Washington University.

Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century, Unpublished PhD Thesis, , The George Washington University.

McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries, Unpublished PhD Thesis, , George Washington University.

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology, Unpublished PhD Thesis, , George Washington University.

  • Type: Thesis
  • Keywords: continuous improvement; cost overrun; effectiveness; construction project; cost control; lean construction; project cost; scheduling; standardization; project performance
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2516760851
  • Abstract:
    Cost overrun has emerged as one of the most frequently reported problems facing projects in the construction industry. The problem of cost overruns is experienced more in publicly funded projects, such as New York City capital projects. Traditional cost control measures have failed to solve the problem of cost overruns in construction projects. This research includes applying nine lean construction principles: supply, people involvement, planning and scheduling, quality, standardization, transparency, waste elimination, continuous improvement, and customer focus. Throughout the construction process, these principles will reduce the element of waste and non-value adding activities, and they will be applied through twenty-five selected sub-principles, which are specific techniques that reduce various forms of waste in the construction process. To investigate the effectiveness of the above lean construction principles in controlling project cost, the research adopted a quantitative approach executed through an online survey involving the managers of the various projects listed in the New York City projects database and nationwide. The study results will show which Lean Construction Principles (LCPs) critical factors will significantly reduce average cost overruns in construction projects. This research proposes a practical model called Lean Principles in Construction Management (LPCM) that can help engineering managers improve overall project performance by reducing major waste factors.

Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry, Unpublished PhD Thesis, , The George Washington University.

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida, Unpublished PhD Thesis, , The George Washington University.

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction, Unpublished PhD Thesis, , George Washington University.

Schulte, W D, Jr. (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry, Unpublished PhD Thesis, , The George Washington University.

Shamma, E M (1988) A dynamic model for the growth of construction firms, Unpublished PhD Thesis, , The George Washington University.

Stuban, S M F (2011) Employing risk management to control military construction costs, Unpublished PhD Thesis, , George Washington University.

Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis, Unpublished PhD Thesis, , The George Washington University.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea, Unpublished PhD Thesis, , George Washington University.

Tonimoghadam, F (2021) A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects, Unpublished PhD Thesis, , George Washington University.

Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri), Unpublished PhD Thesis, , George Washington University.

Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects, Unpublished PhD Thesis, , The George Washington University.